RM16 Billion? Govt Says Helicopter Plant Construction Didn’t Cost A Cent

Date:

Putrajaya has clarified that it did not allocate RM16 billion to build an assembly plant for Italian helicopter manufacturer Leonardo in Batu Berendam, Melaka.

Minister in the Prime Minister’s Department (Federal Territories) Datuk Seri Dr. Zaliha Mustafa explained in a written parliamentary reply that the project is a strategic collaboration between Weststar Aviation Sdn Bhd and the Melaka state government to grow the nation’s aerospace sector.

She stressed that no federal funds were used for the construction of the Leonardo helicopter assembly facility.

Dr. Zaliha said the RM16.546 billion figure mentioned publicly refers solely to a federal contract with Weststar, which covers the leasing of 28 helicopters, as well as maintenance, insurance, and ongoing training for security agency personnel over 15 years.

She reiterated that the contract signed on Dec 19, 2024, has nothing to do with the construction of the assembly plant.

The clarification came in response to a question from Datuk Seri Ikmal Hisham Abdul Aziz (PN–Tanah Merah), who had asked whether the alleged RM16.45 billion allocation for the Melaka assembly plant was a federal loan to the state government, especially since the Defence Ministry is not involved in the project.

Share post:

Popular

More like this
Related

Father Killed in Nilai Crash While on the Way to Pick Up Child

A 38-year-old father was killed this afternoon when his...

20-Year-Old Arrested After Police Seized RM586,500 Cannabis Liquid in Kuching

A 20-year-old man believed to be acting as a...

700 Officers Deployed for Sarawak’s Christmas Road Safety Campaign from Dec 23–28

The Sarawak police will roll out a major road...

Unpaid Summonses Won’t Affect Your BUDI95 Subsidy Eligibility, Says MOT

The Ministry of Transport (MOT) has clarified that outstanding...