FT008 Gua Musang-Merapoh Road Closed For Eight Days For Resurfacing Works

Date:

Federal Route FT008 along the Gua Musang-Merapoh stretch will be closed for eight days from tomorrow until 14 March to facilitate resurfacing works on a diversion near Taman Wangi.

The closure is part of the ongoing Central Spine Road Project (Projek Lingkaran Tengah Utama, LTU) covering Packages 3B and 3C in the area.

Kelantan Public Works Department (JKR Kelantan) Director, Nik Badlihisham Nik Ismail, said the closure affects both directions from the Taman Wangi junction to the Gua Musang Hospital junction.

“During this period, road users are advised to plan their trips in advance, comply with safety signage, and follow instructions from personnel on site to ensure smooth traffic flow.

“The road is expected to reopen to all vehicles on 14 March after resurfacing works are completed,” he added.

Earlier reports by Kosmo! highlighted that damaged roads and traffic congestion along LTU Packages 3B and 3C in Gua Musang had drawn serious attention from the Ministry of Works following public complaints in recent weeks.

Share post:

Popular

More like this
Related

Three Nabbed Over Fatal Skudai Shooting Outside Entertainment Outlet

Police have arrested three individuals, including two men and...

Woman Arrested After Allegedly Breaking Into Stranger’s Home And Slapping Him In Early Morning Attack

A 54-year-old woman in Japan has been arrested after...

Elderly Woman Caught On Camera Yanking Passenger’s Hair In Shocking Priority Seat Clash On MTR

A heated altercation on Hong Kong’s Mass Transit Railway...

Man Jailed 15 Months After Sending Pork To Mosques In Revenge Over Job Loss

A 62-year-old Singaporean man, Bill Tan Keng Hwee, has...